Stop the traffic

-

Road closed

Road campaign aims to divert this blight from our villages.

This month The Village is launching a campaign to end a blight that affects the very spine of this area.

We want to block the Redditch-Birmingham rat-run, through which countless cars, vans and lorries rush each day.

It is now ten years since the long-awaited bypass around Alvechurch opened, yet still the traffic pours through.

It is now two years since the long-awaited traffic calming measures were installed in Alvechurch village, yet still the traffic pours through.

And after it has spoiled that village with its noise, dirt and danger, it goes on to do the same through Barnt Green, Cofton Hackett and Rednal.

So far we have been fobbed off by the highways authorities, who have allowed a piecemeal approach to develop – sometimes paid for out of local parish funds – an approach which has no chance whatsoever of solving the problem.

But now we have a once-in-four-years opportunity to get some action.

The Worcestershire County Council elections take place on May 5 and the current leader of the council and chairman of the cabinet also happens to be the councillor for the Alvechurch “division”.

We must assume, therefore, that Coun George Lord – who is standing for re-election in May – has a significant say over what decisions are made at county hall.

We call on Coun Lord to make a public commitment to put our plea to Stop the Traffic at the top of his re-election agenda.

We know he will say that the county council has a responsibility to a very large area and that this problem is a small speck on the radar of the people at county hall.

Well, we say that it is a very big problem for the people of this area (along with the threat of a rendering plant at Hopwood) – and we are the ones deciding whether or not he is re-elected.

We shall send Coun Lord a copy of this issue of The Village – the Alvechurch councillor lives outside our normal distribution radius – and ask him to respond.

We would like him to agree that this is an urgent matter that deserves his complete attention and that it is worthy of a monthly progress report in the pages of this magazine.

We hope he will take our request seriously enough that he will read the suggestions we make to solve the problem on Page 6 and get back to us with an action plan in time for our next issue.

Perhaps, however, Coun Lord will feel that it is not possible to fulfil such a pledge while carrying out his other commitments at the county council. That’s fair enough.

But then he will have no complaint if someone decides to stand against him, representing the people on this single issue.

We see that Kidderminster is represented at Worcester by a number of independent councillors standing on the single issue of Kidderminster Hospital and Health Concern.

An Alvechurch Stop the Traffic candidate would certainly have a good chance in this area.

Nomination papers for candidates do not have to be delivered to county hall until noon on April 7. That gives plenty of time for someone to step forward and take this challenge to Worcester.

Perhaps there is someone reading this right now who feels strongly enough to do just that.

Above: Village at peace: The brief respite during traffic calming works showed how much better Alvechurch could be with the rat-run closed.

‘We need action now before it is too late’

One local politician who has seen the failure to stop the traffic first-hand is Roger Hollingworth, one of the councillors representing Alvechurch ward on Bromsgrove District Council.

Before being elected to Broms­grove, he was chairman of Alve­church Parish Council while its traffic calming plans for the village were coming to fruition under the tireless leadership of Coun Syd Caddick.

Coun Hollingworth (pictured, above) watched in frustration as plans to spend around £60,000 of the parish’s own funds were watered down by the highways authorities until the village ended up with a few minor changes that have made no difference – but still soaked up the cash.

Coun Hollingworth told The Village: “We have been fobbed off for far too long. The highways authorities have spent money that the parish council had put aside over many years on a scheme that patently has not worked.

“The parish team behind it worked so hard to get the plan implemented, yet without consultation it was watered down and down so that in the end it has virtually made no difference.

“There is probably more traffic than ever coming through the village now. Drivers are happy to wait for a minute, if they have to, at the pinch-point in Swan Street and then put their foot down as they pass through the village.

“Going south, they barely slow down over the hump, which is ineffective, or if they do have to slow, they then accelerate up Swan Street creating more noise and danger.

“And because the engineers decided not to raise the hump by the vet’s in Birmingham Road, there is nothing to slow the traffic down and there is now a real danger of a very bad collision on the mini roundabout at the bottom of Tanyard Lane.

“The point is that the traffic calming in Alvechurch isn’t working. The intention was to push the traffic on to the bypass where it belongs – which would bring welcome relief to Alvechurch, Barnt Green and Cofton Hackett.

“There has recently been an incident in the village which highlights what can happen, and an increasing numbers of cars using the village as a rat-run instead of using the by-pass makes accidents more likely.

“We were told that Alvechurch would become a 20mph zone, but it never happened – instead, we have got traffic racing through, sometimes at speeds of more than 60mph.”

Coun Hollingworth said it was time the county council stopped prevaricating and got on with the job of making Alvechurch a safer village.

“It is no good them saying that we should wait until the new school is built in Alvechurch so that they do not have to pay for traffic calming. Why should the residents pay twice to get the facilities that they deserve?

“George Lord should be fighting now for improvements not waiting for another three or four years for the school to be built. It could be too late by then, somebody could be dead.”

* As readers of The Village will know, there are discussions taking place over building a new road from Hopwood Hill, through the green belt fields above the Bittell reservoirs, to whatever is planned to develop at Longbridge.

This would, of course, attract all of the through traffic away from the villages and on to the Alvechurch bypass where it belongs.

But, putting aside the question of whether such a road and its environmental consequences are desirable, it would be unlikely to happen for at least ten years.

We need something now – why should our villages continue to soak up this traffic when we can put the Alvechurch bypass – now smoothly resurfaced – to its intended use of diverting it quickly and smoothly into Birmingham?

This is what we want

Stage One: Most motorists drive too quickly, so the first action we want is a 20mph speed limit through Alvechurch.

This should start well to the south of the village so drivers face a stark choice of driving at top speed along a dual carriageway or tootling along at 20mph with plenty more hold-ups to come.

We propose the limit should be reduced from 40mph to 30mph from Cobbs Barn to Alvechurch Football Club, then down to 20mph right through the village before reverting to 30mph at the motorway bridge to the north.

Only really thoughtless drivers will drive at more than 50 per cent above the speed limit, so this should immediately bring speeds, and traffic volume, down to reasonable levels.

The fact that the road is so wide at either side of the village from its days as an A-road should not prevent this speed limit reduction.

We can think of plenty of ways to narrow the road, starting with cycle lanes on either side and a one-lane “gateway” at each end. Large signs telling drivers to use the bypass unless they are visiting the villages will also get the message across.

So far, then, the only cost is for some signage and creating gateways and cycle lanes.

Stage Two: If stage one doesn’t work almost immediately, then speed cameras should be installed to enforce the new speed limit.

We’ve suggested cameras before, with varying responses from readers, but an effective method of making the speeders pay – so they will choose the alternative route – may be the only option.

As far as costs are concerned, speed cameras pay for themselves in the fines they reap for the authorities.

Stage Three: If speed cameras, for some reason, do not do the trick, then we may be forced to implement physical measures, such as speed humps, cushions and platforms.

They are not pretty, they are annoying for all road users, they are expensive to install if done properly . . . but they work.

Who, for instance, drives along Hewell Road in Barnt Green at any speed now the humps and platforms and 20mph limit are in place?

There is no reason why such impediments could not be installed from Cobbs Barn to Robert’s Corner – it is, after all, supposed to be a quiet, village B-road.

Clearly, all of these measures will have more imediate effect on drivers heading north, but if they know these restrictions are in place drivers are more likely to choose the preferable route on the way back again.

What do you think?

Do you have any ideas of ways we can Stop the Traffic? Are speed cameras the answer? Is it worth putting up with ugly red humps to enjoy peace and safety?

Tell us how the traffic affects you. Perhaps you’re one of the many who suffers, or perhaps you think that, in a modern world, we should have the traffic speeding through?

Email: .(JavaScript must be enabled to view this email address)

Write to: Stop The Traffic, The Village, 16 The Square, Alvechurch B48 7LA

Could you be a county councillor?
If you are interested in standing for Worcestershire County Council, see https://www.worcestershire.gov.uk or telephone 01905 25121 and ask how to obtain the booklet Do you want to be a councillor?

Councillors are expected to commit 10-15 hours of time a week to perform a basic role.

Previous article
Next article